The order signing and production scheduling process usually includes the following steps:
1. Order reception: Receive customer orders and confirm important information such as order content, quantity, and delivery time.
2. Order confirmation: Check the order information with the customer to ensure accuracy, and discuss possible improvements and adjustments with the customer.
3. Material procurement: Based on order requirements, carry out material procurement work, including selecting suppliers, comparing quotations, and signing procurement contracts.
4. Design and sample production: Design and produce furniture samples according to customer requirements and the designer's design plan.
5. Production scheduling: Determine the production plan and scheduling plan, arrange the operation of production processes, personnel, and machinery to ensure production progress and quality.
6. Production execution: According to the production schedule, carry out furniture production and processing work, including material cutting, part processing, assembly, etc.
7. Quality inspection: Conduct quality inspection on the furniture produced to ensure that it meets customer requirements and standards.
8. Packaging and shipment: Package qualified furniture, prepare for transportation, and arrange for shipment.
9. Shipping and tracking: Arrange the shipment of goods, track the transportation status of goods, and ensure timely arrival at the customer's designated location.
10. Customer feedback: Maintain communication with customers, collect and process customer feedback and suggestions to improve products and services.
WeChat scan code
support hotline13728680716
mobile phone13728680716
Huizhou Silian Smart Home Co., Ltd. Email: szds2001@163.com Consultation hotline: 13728680716